Our team was called in to perform a full track re-rail on a D8T dozer. Over time, track components can wear out and lose the ability to provide the traction and stability required for demanding work environments. We removed the worn-out track pads, replaced them with high-quality components, and re-railed the entire track system to ensure smooth operation. This meticulous process restored the dozer’s ability to navigate tough terrain with efficiency and safety. The newly installed tracks will provide enhanced performance and durability for heavy-duty tasks ahead.